Dual Meridian by David Griggs
A Gates, Center Core
East Parking Garage Partial Closure
Power washing and re-striping is underway at the East Garage through July 30. When work is underway, certain sections will be closed, but other areas of the garage will remain open. Partial closure schedule for East Garage: Phase 1: July 9-12, Rows N-Q, all levels. Phase 2: July 13-16, Rows J-M, all levels. Phase 3: July 20-23, Rows E-H, all levels. Phase 4: July 27-30, Rows A-D, all levels, including Premium Reserve. To complete this work, all vehicles must be cleared from the area scheduled for cleaning. For more information, call 303-342-7275. The above dates are subject to change due to various unforeseen circumstances.
Follow DEN on Twitter Follow DEN on InstagramMost Airline Counters Move to Temporary Locations
DEN is temporarily relocating 24 airline check-in/bag drop counters as construction continues on the Great Hall Program. Between April 9 and June 30, the counters at the south end of Jeppesen Terminal’s east and west sides will be temporarily moving from Level 6 to Level 5. These airlines will remain on Level 5 in their temporary operation through mid-2027.
Additional Information Follow DEN on Twitter Follow DEN on InstagramPopular Searches
Art at Den
A Gates, Center Core
“Dual Meridian” pays homage to the architectural heritage of its site by harking back to the grand, vaulted spaces of turn-of-the-century transportation halls and train sheds. On one side, curvilinear train tracks and indigenous Colorado stones reflect an Iron Age sensibility about transportation. The other side, with its concrete landforms and tiled global map projection, envisions the space-age spectacle of flight. A vaulted titanium arch reaches across the space, revealing those elements as if seen from the orbit of some future mode of transportation.