Beaded Circle Crossing by Alice Adams
B Gates, Center Core
East Parking Garage Partial Closure
Power washing and re-striping is underway at the East Garage through July 30. When work is underway, certain sections will be closed, but other areas of the garage will remain open. Partial closure schedule for East Garage: Phase 1: July 9-12, Rows N-Q, all levels. Phase 2: July 13-16, Rows J-M, all levels. Phase 3: July 20-23, Rows E-H, all levels. Phase 4: July 27-30, Rows A-D, all levels, including Premium Reserve. To complete this work, all vehicles must be cleared from the area scheduled for cleaning. For more information, call 303-342-7275. The above dates are subject to change due to various unforeseen circumstances.
Follow DEN on Twitter Follow DEN on InstagramMost Airline Counters Move to Temporary Locations
DEN is temporarily relocating 24 airline check-in/bag drop counters as construction continues on the Great Hall Program. Between April 9 and June 30, the counters at the south end of Jeppesen Terminal’s east and west sides will be temporarily moving from Level 6 to Level 5. These airlines will remain on Level 5 in their temporary operation through mid-2027.
Additional Information Follow DEN on Twitter Follow DEN on InstagramPopular Searches
Art at Den
B Gates, Center Core
“Beaded Circle Crossing” derives its form from the lodges, tipis and beadwork of Native Americans, as well as from the bridges of Eiffel and Calatrava. The central upper rectangle, symbolic of the earth and of the buffalo, is supported by two iridescent screens of spliced colored-glass tubes alternating with “bugle bead” shapes. The gathering of the poles around the helix of yellow glass may be seen as a sun symbol or as the central opening at the top of the tipi.