Denver International Airport
QUESTIONS AND ANSWERS TO PROJECT DOCUMENTS

Current as of:  11/20/2009

PROJECT:  On-Call Architectural Engineering Design Services 2010, 2010-2, 2010-3, 2010-4
NUMBER:  CE 03001, CE 03002, CE 03003, CE 03004

Question Number  1:   Is there a sample work plan based on the Design Guidelines?
    Answer:   No, there is not a sample work plan available at this time.
Question Number  2:   What is the Design Analysis Report?
    Answer:   The Design Analysis Report (DAR) is described in Design Standards Manual 1 (DSM-1), Chapter 3. The intent of the Design Analysis Report is to present a clear, complete and concise picture of the design of the facilities and systems. It is submitted along with the design, at various times, as described in DSM-1, Chapter 32, (note: also see Table 32-1).
Question Number  3:   Do we have submit subcontractor information for all anticipated services – i.e. Lightening protection services
    Answer:   M/WBE sub-consultants need to be identified as required by the RFP, see 1-11 Attachment 1, Instructions to Proposers. Sub-consultants need to be identified as in 1-12, Attachment 1, Instructions to Proposers. Minor or specialty sub-consultants, such as lightning protection design, may be added during the contract as the need for such sub-consultants is identified.
Question Number  4:   Will addendums to the RFP and new RFP’s be sent via email? Or posted on website?
    Answer:   Any addenda necessary are posted on the website.
Question Number  5:   Can we use a sub consultant who is also on the Parson’s project management team?
    Answer:   Yes, such sub-consultants are allowed. See 1-12 DESIGNATION OF SUBCONSULTANTS